Keywords: battery energy storage; supercapacitor; hybrid energy storage system; peak shaving; urban rail transit; bi-level multi-objective optimization; BESS controller
Context and objective. I begin with the operating reality of an urban rail transit station: traction, regenerative braking, and air-conditioning produce a load that is periodic at the daily scale but highly impulsive at the second and minute scales. The station load has morning and evening peaks, a low overnight base, and frequent short bursts caused by train acceleration and braking. Because the station is exposed to a single-part tariff in the setting I study, a pure electricity-bill-minimization objective is not very informative. I therefore treat load leveling as the primary technical objective and life-cycle cost as the competing economic objective. The central device in my design is a battery energy storage system (BESS) controller that supervises a hybrid energy storage system (HESS) made of batteries (BA) and supercapacitors (SC). The BESS controller does not merely switch devices on and off; it translates the upper-level capacity decision into a lower-level charge and discharge schedule, allocates high-frequency and low-frequency duties, and enforces state-of-charge, power, and energy limits. In this way, the BESS controller becomes the operational bridge between planning and real-time station operation.
I formulate the problem as a bi-level optimization framework. The upper level searches over BA and SC capacities and evaluates each candidate through a Pareto trade-off between load smoothing and annualized total cost. The lower level solves a mixed-integer linear program for a typical daily load profile and returns the best charge and discharge plan for the given capacities. A post-evaluation life model then converts the dispatch result into battery and SC aging indices, which are fed back to the upper level as economic penalties. This decomposition keeps the nonlinear life model outside the lower-level MILP and makes the overall workflow tractable. The BESS controller is present in both layers: in the upper layer it represents the feasible operating envelope, and in the lower layer it executes the optimized dispatch. I use this structure to answer three questions: how much load smoothing can a station-side HESS deliver, how should BA and SC capacity be split, and what is the economic value of a BESS controller that explicitly respects aging.
Load behavior and system architecture. I characterize the station load as the superposition of three components. The first is the traction component, which has short, high-power pulses. The second is the regenerative braking component, which can return energy but is intermittent and depends on train headway and braking strategy. The third is the auxiliary and air-conditioning component, which varies more slowly but has a large daily amplitude. A single storage technology is a poor match for all three components: a battery has high energy density but is stressed by high-frequency cycling, while a supercapacitor has high power density and long cycle life but low energy capacity. The HESS combines them. In my topology, BA and SC are connected to a common DC bus through separate DC/DC converters, and the DC bus is linked to the station AC bus through a DC/AC converter. The BESS controller generates power references for the two DC/DC converters, maintains the DC-bus voltage, and coordinates the HESS with the traction and auxiliary loads. The BESS controller also enforces the charge and discharge limits that appear in the lower-level optimization.

I use a minute-level representation of a typical daily load profile. The original data are second-level measurements, and I aggregate them by interval averaging to obtain 1,440 points per day. This resolution preserves the dominant traction pulses while keeping the MILP size manageable. The BESS controller in the lower-level model receives the net-load target and returns the BA and SC power commands. The upper-level search space is set to 50–500 kWh for BA and 0.5–5.0 kWh for SC. These bounds reflect the practical scale of a station-side installation and allow the optimizer to explore the strong asymmetry between energy-oriented and power-oriented storage.
Table 1. Main storage parameters used in the case study.
| Parameter | BA | SC |
|---|---|---|
| Discharge rate | 0.5 | 20 |
| Self-discharge coefficient | 0.0001 | 0.0005 |
| Charge/discharge efficiency (%) | 95 | 98 |
| SOC range (%) | 10–90 | 10–90 |
| Cycle life (cycles) | 3,000 | 1,000,000 |
| Calendar life (years) | 10 | 15 |
Lower-level dispatch model. I define the set of storage devices as \(es\in\{\mathrm{BA},\mathrm{SC}\}\) and the dispatch horizon as \(t=1,\ldots,T\). Let \(P_t\) be the original station load, \(G_t\) the power drawn from the grid, \(P^{ch}_{es,t}\) the grid-side charging power, and \(P^{dis}_{es,t}\) the grid-side discharging power. The net station load after HESS action is equal to the grid power, so the load-balance equation is
$$P_t+P^{ch}_{b,t}+P^{ch}_{s,t}=G_t+P^{dis}_{b,t}+P^{dis}_{s,t},\qquad \forall t.$$
I use \(b\) and \(s\) as shorthand for BA and SC. The lower-level objective is to minimize the variance of the net load, which is equivalent to smoothing the profile seen by the station transformer and the upstream grid:
$$\min \sigma^2=\frac{1}{T}\sum_{t=1}^{T}\left(\tilde P_t-\bar{\tilde P}\right)^2,$$
where
$$\tilde P_t=G_t=P_t+P^{ch}_{b,t}+P^{ch}_{s,t}-P^{dis}_{b,t}-P^{dis}_{s,t},$$
and \(\bar{\tilde P}\) is the daily mean of the net load. The BESS controller is the entity that realizes this objective by issuing \(P^{ch}_{es,t}\) and \(P^{dis}_{es,t}\) while respecting the device constraints below.
For each storage device, the stored energy evolves as
$$E_{es,t}=E_{es,t-1}+\eta^{ch}_{es}P^{ch}_{es,t}\Delta t-\frac{P^{dis}_{es,t}}{\eta^{dis}_{es}}\Delta t-E^{sd}_{es,t},\qquad \forall t\in\{2,\ldots,T\},$$
where \(\eta^{ch}_{es}\) and \(\eta^{dis}_{es}\) are the charge and discharge efficiencies, \(\Delta t\) is the time step, and \(E^{sd}_{es,t}\) is the self-discharge loss. I model the self-discharge as
$$E^{sd}_{es,t}=E_{es,t-1}\delta_{es},\qquad \forall t\in\{2,\ldots,T\},$$
with \(\delta_{es}\) the self-discharge coefficient. The initial energy is set to a mid-range state of charge:
$$E_{es,1}=E^{res}_{es}SOC^{0}_{es},\qquad SOC^{0}_{es}=0.5.$$
The state of charge must remain inside its allowed band:
$$E^{res}_{es}SOC^{min}_{es}\le E_{es,t}\le E^{res}_{es}SOC^{max}_{es},\qquad \forall t.$$
Charging and discharging are mutually exclusive at each time step. I introduce a binary variable \(u_{es,t}\in\{0,1\}\) and impose
$$0\le P^{ch}_{es,t}\le E^{res}_{es}r^{ch}_{es}u_{es,t},\qquad \forall t,$$
$$0\le P^{dis}_{es,t}\le E^{res}_{es}r^{dis}_{es}\left(1-u_{es,t}\right),\qquad \forall t,$$
where \(r^{ch}_{es}\) and \(r^{dis}_{es}\) are the charge and discharge rates. To avoid end-of-day drift, I require the final energy to return to the initial value:
$$E_{es,T}=E_{es,1}.$$
The BESS controller uses these constraints as a feasible operating envelope. In the lower-level MILP, the BESS controller is not an external rule; it is the mathematical agent that selects \(u_{es,t}\), \(P^{ch}_{es,t}\), and \(P^{dis}_{es,t}\) to minimize \(\sigma^2\). This is important because the BESS controller must simultaneously respect the energy capacity of the BA, the high-power capability of the SC, and the efficiency losses of both devices.
Upper-level capacity model. The upper level searches for the BA and SC capacities \(E^{res}_{b}\) and \(E^{res}_{s}\). It has two competing objectives. The first is to maximize the load-smoothing benefit
$$\max \eta=1-\frac{\sigma_{net}}{\sigma_{ori}},$$
where \(\sigma_{net}\) is the standard deviation of the optimized net load returned by the lower level, and \(\sigma_{ori}\) is the standard deviation of the original load. The second is to minimize the annualized total cost
$$\min C_{total}=C_{inv}+C_{om}+C_{loss}-C_{sal}.$$
I annualize the initial investment with a capital recovery factor:
$$C_{inv}=\left(I_b+I_s\right)I_{crf},$$
$$I_{crf}=\frac{i\left(1+i\right)^{L}}{\left(1+i\right)^{L}-1},$$
where \(I_b\) and \(I_s\) are the initial costs of BA and SC, \(i\) is the discount rate, and \(L\) is the system life used for annualization. Maintenance cost is proportional to investment:
$$C_{om}=I_b\lambda_b+I_s\lambda_s,$$
where \(\lambda_b\) and \(\lambda_s\) are the maintenance rates. The loss cost captures the energy lost in charging and discharging:
$$C_{loss}=\sum_{t=1}^{T}\left[P^{ch}_{b,t}\left(1-\eta^{ch}_{b}\right)+P^{dis}_{b,t}\left(1-\eta^{dis}_{b}\right)+P^{ch}_{s,t}\left(1-\eta^{ch}_{s}\right)+P^{dis}_{s,t}\left(1-\eta^{dis}_{s}\right)\right]\Delta t\,p_eD_{year},$$
where \(p_e\) is the electricity price and \(D_{year}\) is the number of operating days per year. The salvage term credits the residual value at the end of life:
$$C_{sal}=I_bR_bI_{sff,b}+I_sR_sI_{sff,s},$$
$$I_{sff}=\frac{i}{\left(1+i\right)^{L}-1},$$
where \(R_b\) and \(R_s\) are the residual-value ratios. The BESS controller influences all three cost components because its dispatch decisions determine throughput, losses, and aging. A schedule that is aggressive in smoothing may look attractive at the lower level, but it can increase \(C_{loss}\) and reduce the service life that is credited in \(C_{inv}\) and \(C_{sal}\). The upper level therefore evaluates each capacity pair through the BESS controller’s optimized daily behavior.
Life evaluation. I treat battery aging with a depth-of-discharge-dependent cycle model. The full-cycle life at a given depth \(D_{cyc}\) is
$$N_{b,life}=N_{b0}D_{cyc}^{-\omega},$$
where \(N_{b0}\) is the cycle life at 100% depth and \(\omega\) is the life exponent. I use \(\omega=2.1\). The daily equivalent full cycles are
$$N_{b,eq}=\sum_{t=1}^{T}\left[D_{cyc}(t)\right]^{\omega},$$
and the cycle life in years is
$$T_{b,cyc}=\frac{N_{b0}}{D_{year}N_{b,eq}}.$$
For the SC, I use a throughput-based model because the SC is much less sensitive to depth but is stressed by frequent high-power cycling. The daily throughput is
$$Q_{day}=\sum_{t=1}^{T}\left|P_{s,t}\right|\Delta t,$$
the annual equivalent cycles are
$$N_{s,year}=\frac{Q_{day}D_{year}}{E^{res}_{s}},$$
and the cycle life is
$$T_{s,cyc}=\frac{N_{s0}\eta_{s}}{N_{s,year}},$$
where \(N_{s0}\) is the baseline cycle life and \(\eta_{s}\) is the capacity-retention factor. The actual service life of each device is the smaller of its calendar life and cycle life:
$$\tau_{es}=\min\left\{T_{es,cal},T_{es,cyc}\right\}.$$
This post-evaluation is deliberately separated from the lower-level MILP. The BESS controller first finds the best dispatch for a candidate capacity; the life model then audits the resulting BA depth profile and SC throughput. In this way, the BESS controller remains a linear scheduling agent, while the nonlinear aging penalty is applied after the fact. The upper level can therefore reject capacity pairs that achieve good smoothing only by overusing the BA or by pushing the SC beyond its economic life.
Solution workflow. I use the non-dominated sorting genetic algorithm II (NSGA-II) at the upper level. The workflow is as follows. First, I initialize a population of capacity pairs \([E^{res}_{b},E^{res}_{s}]\). Second, for each pair, the BESS controller solves the lower-level MILP with the daily load profile and returns the optimal charge and discharge trajectories. Third, I compute the net-load standard deviation, the annualized investment, maintenance, loss, and salvage costs, and the BA and SC life estimates. Fourth, NSGA-II ranks the population by non-domination and crowding distance, then applies selection, crossover, and mutation to generate a new population. Fifth, the loop repeats until the maximum generation count is reached. I use a population size of 50 and a maximum of 100 generations. The output is a Pareto front in the \((\eta,C_{total})\) plane. The BESS controller is evaluated many times during this loop, and each evaluation represents a complete daily operating policy rather than a fixed rule.
Table 2. Optimization settings and decision variables.
| Item | Value or range |
|---|---|
| Load resolution | 1 min, 1,440 points per day |
| BA capacity search range | 50–500 kWh |
| SC capacity search range | 0.5–5.0 kWh |
| Upper-level algorithm | NSGA-II |
| Population size | 50 |
| Maximum generations | 100 |
| Lower-level solver | MILP with branch-and-bound |
| BESS controller role | Enforce SOC, power, energy, and efficiency limits while minimizing net-load variance |
Operational behavior. I observe a clear division of labor between BA and SC. The BA performs inter-temporal energy transfer: it charges during low-load and flat periods and discharges during the morning and evening peaks. The SC performs high-frequency fluctuation smoothing: it charges and discharges rapidly around the net-load target, absorbing traction pulses and braking transients. The BESS controller coordinates these two behaviors. In the lower-level solution, the BESS controller gives the BA a slowly varying reference and gives the SC a fast reference. The BA state of charge changes smoothly across the day, while the SC state of charge moves rapidly within a narrow band. This is exactly the behavior that a well-designed BESS controller should produce: the energy-dense device carries the daily energy imbalance, and the power-dense device carries the short-term mismatch.
Table 3. Typical daily coordination statistics by period.
| Period | BA equivalent cycles | SC equivalent cycles | BA net SOC change | Dominant HESS action | BESS controller emphasis |
|---|---|---|---|---|---|
| Overnight low load | 0.95 | 11.3 | +40.0% | Charging | Restore BA energy; absorb small SC ripple |
| Morning peak | 1.6 | 61.2 | −55.5% | Discharging | Release BA energy; suppress traction pulses with SC |
| Midday flat | 2.8 | 110.4 | +50.5% | Charging | Recover BA energy; filter fast load components |
| Evening peak | 1.3 | 50.4 | −65.8% | Discharging | Discharge BA; use SC for high-frequency support |
| Late flat | 1.6 | 55.2 | +33.2% | Charging | Smooth recovery; limit BA stress |
The equivalent-cycle numbers show that the SC cycles far more often than the BA, while the BA carries the large net SOC swings. The BESS controller uses the SC as a buffer that protects the BA from high-rate events. In the peak periods, the HESS is predominantly discharging, and the BESS controller avoids the inefficient state in which the BA charges while the SC discharges. In the overnight and flat periods, the HESS is predominantly charging, although both devices may discharge together when the load spike is large. The BESS controller rarely allows the BA to discharge alone for a large fraction of the peak; instead, the SC provides the fast component and the BA provides the sustained component. This coordination reduces the depth and rate of BA cycling and is the main reason the BA can remain close to its calendar-life limit in the optimized solutions.
Capacity sensitivity. I find that increasing storage capacity always improves load leveling within the studied range, but the marginal benefit declines. For the BA, each additional 100 kWh raises the standard-deviation improvement by about 3.32–3.54 percentage points. For the SC, each additional 1 kWh raises the improvement by about 0.99–1.10 percentage points. These numbers are not constant; they depend on the operating point and on how the BESS controller allocates the added capacity. The important point is that the SC has a high marginal effect per unit of energy capacity because it targets the high-frequency portion of the load, which is poorly served by the BA alone. The BA has a larger absolute effect because it shifts energy across hours, but its marginal effect per unit of investment falls as its capacity grows.
Table 4. Capacity sensitivity within the studied range.
| Storage type | Increment | Improvement in standard-deviation reduction | Interpretation |
|---|---|---|---|
| BA | 100 kWh | 3.32–3.54 percentage points | Strong inter-temporal energy shifting; diminishing returns at large capacity |
| SC | 1 kWh | 0.99–1.10 percentage points | High power density; strong high-frequency smoothing per kWh |
The unit-cost perspective is more revealing. I define the unit-cost leveling efficiency as the improvement in load smoothing per unit of annualized cost. As BA capacity increases, this efficiency tends to fall because the BA becomes oversized for the low-frequency energy imbalance and its incremental cost is not matched by a proportional smoothing gain. As SC capacity increases, the unit-cost efficiency tends to rise within the studied range. The reason is that the SC improves the operating condition of the BA: it absorbs the fast transients, reduces the BA discharge depth, and lowers the BA loss and aging cost. The BESS controller exploits this complementarity. A larger SC gives the BESS controller more freedom to reserve the BA for slow energy transfer and to use the SC for fast regulation. The result is that the SC investment can pay for itself not only through its own smoothing contribution but also through the reduced life-cycle cost of the BA.
Table 5. Directional effect of capacity on unit-cost leveling efficiency.
| Change | Effect on unit-cost leveling efficiency | Reason |
|---|---|---|
| Increase BA capacity | Generally decreases | BA becomes oversized for slow energy transfer; marginal cost grows faster than marginal smoothing |
| Increase SC capacity | Generally increases | SC protects BA, reduces BA aging and losses, and handles high-frequency pulses efficiently |
Pareto trade-off. The Pareto front has a clear knee. On the lower-left side, the slope is steep: a small investment yields a large improvement in load leveling. On the upper-right side, the slope is flatter: additional smoothing requires a disproportionately large cost. In my case, the knee lies at an annualized cost of about 64,000–73,000 CNY, corresponding to a load-leveling improvement of about 8.4%–9.2%. This knee is not a fixed engineering rule; it is the result of the BESS controller’s dispatch behavior and the life-cycle cost model. The BESS controller contributes to the knee because its ability to shift work from the BA to the SC changes the marginal cost of smoothing. At low capacity, the BESS controller is constrained by both devices and the marginal benefit of adding storage is high. At high capacity, the BESS controller has enough freedom to smooth most of the load, and further capacity mainly adds investment and maintenance cost.
Table 6. Pareto-front summary and selected design point.
| Item | Value |
|---|---|
| Knee annualized cost | 64,000–73,000 CNY |
| Knee load-leveling improvement | 8.4%–9.2% |
| Minimum improvement constraint | 10% |
| Selected BA capacity | 134.8 kWh |
| Selected SC capacity | 5.0 kWh |
| Annualized cost at selected point | About 90,000 CNY |
| Selected configuration character | Small BA plus large SC within the search space |
When I impose a minimum load-leveling improvement of 10%, the selected design is 134.8 kWh BA plus 5.0 kWh SC, with an annualized cost of about 90,000 CNY. This point is not the cheapest design, nor is it the design with the highest smoothing. It is the point that satisfies the technical requirement at the lowest economic penalty on the Pareto front. The BESS controller at this point uses the SC at its upper search bound for most of the day and keeps the BA within a moderate capacity range. The BA reaches its calendar-life limit, which means the BESS controller does not overcycle it. The SC operates below its calendar life, which means it absorbs the high-frequency stress that would otherwise damage the BA. This is the techno-economic rationale for the asymmetric configuration: the SC is not sized to carry daily energy; it is sized to protect the BA and to provide fast regulation.
Design-variable distribution. The Pareto-optimal solutions cluster toward a small-BA and large-SC pattern. Once the BA capacity exceeds a modest threshold, almost all non-dominated solutions push the SC capacity toward the upper part of the search range. When the budget is tight, the optimizer prefers to adjust the SC capacity because the SC gives a higher unit-cost leveling benefit. When the budget is generous, the optimizer still prefers a large SC because the BESS controller can use it to reduce BA stress and extend BA service life. This result should not be read as a universal rule that SC should always be maximized. It is a statement about the studied station load, the single-part tariff, and the assumed cost and life parameters. Within this setting, the BESS controller turns the SC into a protective and regulating asset, and the BA into an energy-shifting asset.
Life-cycle interpretation. The life results reinforce the operational results. In all selected configurations, the BA predicted life reaches its calendar-life limit, which indicates that the BESS controller successfully avoids excessive BA cycling. The SC predicted life is below its calendar life, which indicates that the SC carries the main high-frequency burden. This is not a failure of the SC; it is the intended division of labor. The SC is the device that is allowed to cycle frequently, while the BA is preserved for daily energy transfer. I also observe a positive relationship between SC capacity and SC predicted life: a larger SC experiences lower charge and discharge rates and shallower cycles for the same load disturbance, so its aging rate falls. The BESS controller benefits from this relationship because a larger SC gives it more headroom to absorb transients without violating power limits.
Practical implications. The results lead me to several engineering conclusions. First, a station-side HESS should not be sized by energy capacity alone. The BESS controller must be designed together with the capacity split, because the controller determines how much of the load is assigned to the BA and how much to the SC. Second, the SC should be treated as a life-extending asset for the BA, not merely as an additional smoothing device. The economic case for the SC includes the avoided BA degradation and the reduced loss cost. Third, a single-part tariff does not remove the value of storage; it changes the objective from bill minimization to load leveling and reliability. The BESS controller can still create value by reducing transformer stress, reducing peak demand on the upstream grid, and supporting renewable energy consumption at the station level. Fourth, the Pareto front is a useful decision tool because it exposes the marginal cost of additional smoothing. A station operator can choose a point on the front according to its technical requirement, investment budget, and risk preference.
Controller requirements. The BESS controller implied by this study must satisfy several practical requirements. It must enforce the SOC band at every time step, because the lower-level MILP assumes that the BA and SC never violate their limits. It must coordinate the two DC/DC converters so that the SC responds faster than the BA. It must avoid simultaneous charging and discharging of the same device, which is why the lower-level model uses a binary variable. It must account for efficiency and self-discharge, because otherwise the energy balance will drift and the final SOC will not return to its initial value. It must also provide a degradation-aware operating policy: the BESS controller should not use the BA for high-rate events when the SC has available power and energy headroom. In my results, the BESS controller naturally produces this behavior because the lower-level objective is load variance and the post-evaluation penalizes BA aging. In a real installation, the BESS controller would need a fallback rule for communication loss, converter saturation, and emergency conditions, but those fallback rules should preserve the same priority: use the SC for fast transients and reserve the BA for sustained energy transfer.
Modeling scope and limitations. I use a typical daily profile and a deterministic lower-level MILP. This is appropriate for capacity planning because it captures the dominant periodic behavior and keeps the bi-level search tractable. The model does not represent second-by-second converter dynamics, nor does it represent random train delays or weather-driven air-conditioning variation. Those effects would require a stochastic or robust extension. The life model is an engineering approximation: the BA model is depth-dependent, and the SC model is throughput-based. More detailed electrochemical models could improve accuracy but would make the upper-level search much more expensive. I therefore use the post-evaluation approach as a compromise between fidelity and tractability. The BESS controller in this study is an optimization-based controller, not a hardware controller; its outputs are power references that a real controller would track with an inner voltage or current loop.
Comparison with frequency-decomposition methods. Many HESS sizing studies use moving-average filters, empirical mode decomposition, or wavelet packet decomposition to split the load into frequency bands. Those methods are intuitive and easy to implement, but their results depend on window length, cutoff frequency, decomposition level, and mode-selection rules. I avoid that dependence by letting the lower-level optimization determine the split endogenously. The BESS controller does not receive a predetermined high-frequency signal; it chooses the BA and SC powers that minimize net-load variance subject to device constraints. This makes the capacity result more reproducible and reduces the need for expert tuning. The trade-off is computational cost: the MILP must be solved for every candidate capacity, and the upper-level NSGA-II must evaluate many candidates. In my case, the minute-level horizon and the moderate number of binary variables keep the computation manageable.
Economic interpretation of the selected point. The selected 134.8 kWh BA plus 5.0 kWh SC configuration is a compromise between the knee region and the 10% technical requirement. The annualized cost of about 90,000 CNY is higher than the knee cost, but it buys a smoother net load and a more predictable operating envelope. The BESS controller at this point does not exhaust the BA; the BA life is calendar-limited rather than cycle-limited. The SC is the device that experiences the most cycling, and its capacity is large enough to keep its own aging within reason. If the station operator were willing to accept 9% improvement, the knee region would offer a lower cost. If the operator required 12% improvement, the Pareto front would move to a larger BA and possibly a larger SC, and the BESS controller would have to accept more BA throughput or more SC stress. The Pareto front therefore gives a transparent map from technical requirement to economic commitment.
Table 7. Summary of main findings.
| Finding | Result | Role of the BESS controller |
|---|---|---|
| Load smoothing | HESS reduces net-load variance significantly; improvement increases with capacity but with diminishing returns | Allocates slow energy transfer to BA and fast regulation to SC |
| Device coordination | BA carries inter-temporal energy; SC carries high-frequency cycling | Prevents inefficient simultaneous charge/discharge and protects BA from high-rate events |
| Capacity split | Small BA plus large SC is favored within the search space | Uses SC headroom to reduce BA stress and improve unit-cost efficiency |
| Life impact | BA reaches calendar life; SC absorbs high-frequency stress | Keeps BA cycling moderate and uses SC as a sacrificial high-cycle buffer |
| Pareto design | 10% improvement requires 134.8 kWh BA plus 5.0 kWh SC at about 90,000 CNY per year | Tracks the selected dispatch and enforces all operating constraints |
Conclusion. I have presented a bi-level optimization framework for a station-side HESS in urban rail transit. The lower level uses a MILP to minimize net-load variance and produces the daily charge and discharge schedule. The upper level uses NSGA-II to search BA and SC capacities and to build a Pareto front between load smoothing and annualized life-cycle cost. The BESS controller is the operational core of the framework: it enforces SOC, power, energy, and efficiency constraints, coordinates the BA and SC, and translates capacity decisions into feasible daily behavior. The case results show that the HESS is effective for peak shaving and valley filling, that the BA and SC have complementary roles, and that a small-BA plus large-SC configuration can be economically attractive within the studied range. With a 10% load-fluctuation improvement requirement, the selected design is 134.8 kWh BA plus 5.0 kWh SC, with an annualized cost of about 90,000 CNY. The BESS controller at this design preserves the BA near its calendar-life limit and lets the SC carry the high-frequency burden. I conclude that capacity planning and BESS controller design must be treated together: the value of the SC is not only its own smoothing contribution but also its ability to protect the BA and reduce the long-term cost of the HESS.